Roof replacement

A roof is a system, not a stack of shingles. We replace the whole thing, and you see the price before we start.

Get a free inspection(731) 617-5502
GAF Certified installerBBB A+ accreditedWest TN HBA Remodelers CouncilLicensed & insured

Signs it is time

Any one of these on its own might be a repair. Three or more usually means the roof is done.

  • Shingles curling, cupping or losing granules by the handful
  • Bald patches where the mat shows through
  • Granules collecting in the gutters and at the downspout
  • More than one leak, or the same leak coming back
  • Daylight visible through the decking in the attic
  • Sagging between the rafters
  • Roof is past 20 years and has never been replaced
  • An insurance adjuster has already called it

What a Rapid Roofing replacement includes

This is the whole system, from the deck up. If a bid you are comparing does not list all of this, ask what is missing.

LayerWhat we do
Tear-offEvery existing layer comes off, down to the wood. We do not roof over.
DeckingInspected sheet by sheet. Soft or rotten wood is replaced and shown to you.
Drip edgeNew metal at every eave and rake.
Ice & water shieldValleys, eaves and every penetration.
UnderlaymentSynthetic across the whole deck. No felt.
Starter courseFactory starter at eaves and rakes, not cut-up shingles.
ShinglesYour choice from the options below, nailed to manufacturer spec.
FlashingNew pipe boots, step flashing, chimney and skylight flashing as needed.
VentilationRidge vent and intake balanced so the attic actually breathes.
Ridge capMatching manufactured cap, not bent three-tab.
CleanupTarps down, magnet over the whole yard and drive, debris hauled the same day.

Decking replacement is an allowance on your estimate. We can only see what is under the shingles once they are off, so we price a per-sheet rate up front and you pay for what we actually use.

Your options

SystemBest forManufacturer warrantyStarting at
3-tab shingleRentals and tight budgets25 years, limited$395 / square
Architectural shingleMost homes here. The default we recommend.Lifetime, limited$465 / square
Architectural + GAF systemHomeowners who want the full manufacturer packageLifetime + extended coverage$545 / square
Impact-resistant shingleHail country, and often an insurance discountLifetime, limited, Class 4$625 / square
Standing-seam metal40+ year horizon, farm buildings, modern buildsManufacturer paint & panel$1,150 / square

A “square” is 100 square feet of roof. A typical 1,800 sq ft ranch is roughly 20 to 24 squares. Starting-at prices assume a walkable pitch and one layer of tear-off; steep pitch, extra layers, decking and two-story access are priced separately and shown as their own lines on your estimate.

Two warranties, and they are not the same thing

Our workmanship warranty

5 years (sample) covering how the roof was installed. If it leaks because of how we put it on, we come back and fix it. No charge, no argument.

Full terms on the policies page.

The manufacturer warranty

Covers the shingles themselves against defects. Because we are GAF Certified, we can register coverage that non-certified installers cannot offer at all. Length depends on which system you choose.

Registered in your name after the final walkthrough.

Ask every bidder this: is your workmanship warranty in writing, and are you certified to register the manufacturer warranty? A lot of bids quietly have neither.

Paying for it

Ask us about payment options on larger jobs. (sample)

If this is an insurance claim, the path is different and usually cheaper for you. Start on the storm damage page instead.

Why two roofs the same size cost different money

When you compare bids, these are the lines that move the number. Any honest estimate shows them separately instead of burying them.

FactorEffect on price
PitchSteeper than 6/12 means harnesses and slower work. Priced per square.
LayersEvery extra layer of old roof is another tear-off and more disposal.
DeckingRotten sheets are found after tear-off. Priced per sheet, up front.
StoriesTwo-story access adds staging and time.
PenetrationsChimneys, skylights and dormers each need their own flashing detail.
AccessTight lots, fences and landscaping change how we stage and protect.

Questions we get

How long does a roof replacement take?

Most single-family homes here are one to two days. Weather and decking surprises are the two things that stretch it, and we tell you the same day if either shows up.

Do I need to be home?

No. We need access to the driveway and a way to reach the attic if there is decking work. Plenty of our customers are at work the whole time.

Can you just go over the old roof?

We do not. Roofing over hides rotten decking, voids most manufacturer warranties, and makes the next replacement more expensive. If a bidder offers it as a saving, that is what you are buying.

What about my landscaping and the yard?

We tarp beds and shrubs, keep debris off the lawn, and run a magnet over the whole yard and driveway before we leave. If you find a nail afterwards, call us and we will come back out.

Will you match my existing shingle colour?

We can get close, and on a full replacement it does not matter because the whole roof is new. For repairs, exact matching on a weathered roof is rarely possible and we say so up front.

Do you pull the permit?

Where one is required, yes, and it appears as its own line on your estimate.

What if it rains partway through?

We do not tear off more than we can dry-in the same day. If weather turns, the open deck gets covered before we leave the site.

Find out what your roof actually needs

The inspection is free and the estimate is in writing. If a repair will get you a few more years, we will tell you that instead.

Get a free inspectionI think it is just a leak